Photos

Check out our collection of photos capturing the construction of the Blackwater CSO Tunnel:

MOBILIZATION & GROUNDBREAKING CEREMONY

EXCAVATION OF 7TH STREET SHAFT

EXCAVATION OF TUNNEL

TUNNEL TOURS | MAY 29, 2026

Guests of the Tunnel Tours walk past equipment in the excavated tunnel path.
Inside the Blackwater CSO Tunnel looking toward the beginning of the excavated path.